Technical requirements for modulation and plasticization of PT clay
The technical requirements for the preparation and plasticization of PT clay are as follows: (1) Coal tar should be dehydrated before preparing PT clay. During dehydration, warm water must be heated slowly to prevent coal tar from foaming and overflowing. The heating temperature should be maintained at 120~1
2015-03-12
Application of externally attached waterstops
Application of externally attached waterstops: Externally attached waterstops are widely used in various types of concrete structures, such as retaining dams, reservoirs, subways, culverts, tunnels and other underground projects. exist
2015-03-12
Construction technical requirements and quality standards of closed-cell foam plastic panels
Construction technical requirements and quality standards for closed-cell foam plastic panels: (1) The closed-cell foam plastic panels are made of high-pressure polyethylene low-foaming closed-cell foam plastic panels, and the material properties do not change when interacting with the sealant.
2015-03-12
SR flexible filler construction technology
SR flexible filler construction technology: foundation treatment and drilling, applying primer and laying rubber rods, embedding SR flexible filler, installing anti-seepage cover sheets, edge sealing and fixing. Plastic caulking in the above construction process
2015-03-12
SGJL851 polysulfide sealant construction method
Construction method of SGJL851 polysulfide sealant: (1) The construction method of non-sag type glue is: pour two sets of two-component polysulfide sealant A and B on a glass plate or floor tile at the same time (the floor tile must be